Saturday, September 5, 2009

Project 2

This is my second project for Tech and Detailing, it took quite a lot longer, closer to 15 hours. It includes details for some sidewalk joints and various reinforced concrete foundation section details. And now that I've finished, I'm talking to Sophie! Yay!!!




5 comments:

sp said...

Well this looks fantastic but what do those things mean?

Unknown said...

hee hee...

Unknown said...

Well, the triangle things with little dots are concrete structures, the crosshatchy type things are soil, and the dashed lines and dots are pieces of steel reinforcement (rebar). The little black and white circles are elevation symbols...I think that about covers everything. The sidewalk joint things are side views of the lines that you see on sidewalks. They have to have expansion and contraction joints to keep from cracking and such when it warms and cools. Anyways, I guess that's kinda a quick overview.

sp said...

You're so smart

Unknown said...

*grins* Thank you baby!